> ## Content Index
> Fetch the complete content index at: https://payrollobserver.ghost.io/llms.txt
> Use this file to discover other available public pages before exploring further.

# Payoneer alternatives for game studios paying international production contractors
- URL: https://payrollobserver.ghost.io/payoneer-alternatives-en-2026/
- Published: 2026-11-22T15:00:15.000Z
- Updated: 2026-11-22T15:00:15.000Z
- Description: How businesses can evaluate Payoneer alternatives for international contractor payments.
- Author: Aleksei

By Payroll Observer

Suppose a studio commissions an asset set and a localization pass against two release milestones. Before the next payment run, the operations lead needs to answer one question: which system holds the proof that this version of the work was accepted, by whom, and under what payment permission? Payoneer moves the money. Whether it also holds the record the studio needs when a production reviewer, a finance approver and an international contractor disagree about what was approved is a different question.

The decision starts with the layers of the workflow. A payment service executes a transfer the studio has already authorized. A contractor workflow platform may link contracts, tasks, review states and payment instructions; check which records the chosen product actually supports. Studios often need both, and neither layer substitutes for the other when a reviewer asks which build of an asset was signed off or a contractor asks why one milestone was paid and the next was not.

Payoneer sells both layers under separate products, so it appears in this comparison twice. Send Payments is the transfer product: a business sends a single payment or uploads a file for up to 1,000 recipients across multiple currencies, funded from a Payoneer balance or an external source. Payoneer Workforce Management — Contractor Management System (CMS) is the contractor-administration product: invoice creation and tracking, expense submission and approvals, and downloadable payment history. Keep the production reviewer’s acceptance of each asset version in the studio record. The two products carry different terms, limits and permissions.

Compare Wise Business, Deel, 4dev.com and the two Payoneer products against the same record: contractor identity, contract, deliverable version, acceptance evidence, payment authorization and payment reference. The appropriate choice depends on which parts the studio already documents.

## Choose which part of the milestone workflow to replace

The operations lead should replace the payment rail alone when the studio already keeps a reliable record that ties a contractor, a deliverable version, the production acceptance decision and the payment authorization together. If that record lives across inboxes, spreadsheets and chat, a payment service leaves the same gap it was meant to close, and a contractor workflow platform becomes the candidate. In the hypothetical studio commissioning an asset set and a localization pass, the first question is which condition applies.

### Payment services and contractor platforms solve different problems

A payment service executes a transfer the studio has already authorized. Payoneer Send Payments, for example, lets a business send a single payment or upload a file for up to 1,000 recipients across multiple currencies, funded from a Payoneer balance or an external source; the exchange rate and fee are shown before confirmation, and payment status is tracked in the account. The studio should separately record the production reviewer’s acceptance of the particular asset build.

A contractor workflow platform may link the contract, task or milestone, review state and payment instruction. Verify that the chosen configuration actually retains each record. That category covers a wider job than moving money. It matters when the studio cannot show, months later, which localization revision was approved or who had authority to release the milestone payment.

### Keep Payoneer CMS in the comparison

Payoneer also sells CMS, a contractor-administration product with invoice creation and tracking, expense submission and approvals, and downloadable payment history. In the pilot, check how the account records creative acceptance and asset versions, and whether a separate finance permission is available. Treat it as a separate baseline from Send Payments. The file limit of up to 1,000 recipients belongs to Send Payments and should not be carried over to CMS.

The route to a choice follows from that split. First, test the studio's existing record: can it answer who accepted which version and who authorized payment? If yes, a payment service may be sufficient. If no, compare a contractor workflow platform against the missing part of the record. The next section builds that record before any vendor is scored against it.

## Give each deliverable a traceable contractor record

A workable record gives every approved deliverable its own line: contractor ID, contract ID, release milestone, deliverable version, review evidence, acceptance decision, approver, payment authorization and provider payment reference. One contractor can hold several lines across milestones; identify each line by contractor, task, milestone and deliverable version. The point is to answer, months later, which version was accepted, who accepted it and who released the payment.

### Record the scope, version and acceptance criteria

Start with the contract and the task scope. The contract ID identifies the agreement that governs the work; the task or statement of work identifies the asset set or localization pass. Add the release milestone and a version label the production team already uses. In the hypothetical studio, asset set A, milestone 3, version 4 and localization pass B, milestone 2, version 1 are two separate records under one contractor ID. Neither record is complete until the review evidence is attached: the build number, the review ticket, the comments that closed the issue, or the signed-off checklist.

Acceptance criteria belong to the task scope. The record should show what the reviewer checked: file specifications, string-table completeness, context notes for translators or an asset manifest. Those criteria describe what the studio asked for. They stay attached to the deliverable version even when the payment instruction changes.

### Assign acceptance and payment authority separately

Production acceptance and payment permission are two decisions and should carry two names. The production lead or art director accepts the deliverable against the criteria. A finance authorizer releases payment against the accepted record. In a small studio one person may hold both roles, but the record should show which capacity signed at each step, because platform permissions may not mirror internal authority. A manager account with payment rights can release funds without having reviewed the work, and a reviewer comment can accept the work without finance approval.

The handoff is where traceability usually breaks. Write it as a status change on the deliverable record: accepted by the named role and awaiting payment authorization, followed by the authorizing role and provider reference. If the contractor can see the milestone status in a portal, the studio still needs its own record of who approved what. The studio’s authority policy names who may approve each decision; configure vendor permissions to match that policy.

![A proposed studio record connects contractor and contract, deliverable version, production review, payment authorization and payment reconciliation.](https://vaslbzdzm4vk4cvc.public.blob.vercel-storage.com/articles/7dacf9f0e8ee5c98b8124eb1baa902b1c7f76fd91c11db757477ac915be5c019.png)

*A proposed studio control links each milestone to its contractor and records the handoffs through reconciliation. Applicable contract terms and review settings can determine completion separately from this internal sequence.*

The diagram’s takeaway is the chain the studio needs: contractor identity and scoped deliverable linked to production acceptance, payment authorization and reconciliation. Contractual completion rules and the studio’s approval sequence can differ, so the internal chain has to be readable on its own.

Two examples. For the asset set, the art director accepts version 4 and finance authorizes the milestone payment. For the localization pass, the localization lead accepts version 1 after a revision, and finance authorizes only that version’s payment. If a revision arrives after authorization, the record gets a new version line; the old authorization does not cover it automatically. State that studio policy explicitly and check whether the platform enforces it.

### Keep rights documents beside the work record

The deliverable record should point to the rights documents that apply to that version: the contractor agreement clause on intellectual property, any separate assignment and the schedule that lists the deliverable. An agreement may vest rights on creation, on acceptance, on payment or on a separate assignment, and the applicable law and work type can change the result. The record’s job is to make the applicable document easy to find; legal review remains separate.

For the hypothetical asset set, the record references the contractor agreement’s IP clause and the accepted asset manifest. For the localization pass, it references the same agreement plus any client-specific restrictions on source text and terminology. If a subcontractor contributed to the deliverable, the record should show that chain and the relevant terms, because the studio’s contract may allow subcontracting without making the subcontractor’s rights automatically clear.

A studio that can produce this record for every approved deliverable can compare payment services and contractor platforms on the same question: which one carries the chain without losing a version, an approver or a payment reference.

## Check what can turn submitted work into a payable task

Three events deserve separate boxes: agreeing the task, accepting the delivered result, and the moment the task counts as complete under the contract. The third creates a fee. Under the 4dev.com client MSA effective 20 August 2026, completion can occur without a fresh approval click. §3.6.2 treats a task as complete once the review period has expired, provided the client has not submitted a refusal and a list of deficiencies. A second route exists where the client has opted in: §3.6.6 covers tasks the client chose to accept automatically. §5.3 then makes “the relevant Fees … due and payable.”

That distinction matters for the hypothetical studio’s review queue. The MSA sets the contract rule; the queue is a studio control. A reviewer who sits on a localization pass longer than the task’s review period has, by the contract’s clock, let the work complete. The cited passages put no separate finance officer between completion and the fee. A studio may run one, and it would run on the studio’s own authority, outside the platform’s completion logic. Completion triggers a fee. Whether the contractor’s bank account was credited is a separate status the studio confirms on its own record.

### Inspect review deadlines and automatic acceptance

There are two levers, and they are independent: the length of the review period for a given task, and the automatic-acceptance setting.

The review period is specified per task under clause 3.4, so the studio’s first job is a list. For each open task: review period, start date, expiry date. The asset set at milestone 3, version 4 enters that list on submission, and its expiry date sits in the record next to the reviewer’s name. Compare the actual deadline with the production schedule, including any release freeze.

Automatic acceptance is an option the client chooses, and §3.5 carves out fraud and liability that cannot be excluded by law. Check whether it is switched on in the account and confirm which tasks it covers. With it on, a task is deemed complete immediately when the subcontractor completes it. The agreement also describes a waiver of specified remedies to the fullest extent permitted by law, subject to its stated exceptions.

One operational rule follows: the owner of the review queue keeps a calendar of expiry dates and treats the day before expiry as the real deadline. This calendar is a proposed studio control.

### Test a revision before approving the next release

Revisions expose the gap between the studio’s version labels and the contract’s task object. Suppose the localization lead finds terminology errors during review of version 1\. Submit a refusal and list of deficiencies within the applicable review period where the agreement requires it. Ask how a revision or a new task affects the deadline and fee before relying on either route; the cited clauses do not establish a reset rule.

The pilot question is therefore concrete. Submit one revision and observe three things: whether the platform opens a new task or amends the existing one, what timestamp the status carries, and whether completion of the earlier version already made a fee due. Write the assumed outcome into the studio record, and make the reviewer’s acceptance note name the version it covers.

Ask whether the setting can be controlled by task, and assess its consequences before using it for any asset drop.

## Compare alternatives against the same milestone record

Run the same hypothetical record through each option. Asset set A sits at milestone 3, version 4, accepted by the art director on 4 March. Localization pass B sits at milestone 2, version 1, returned for a terminology revision that week. Each line must show contractor ID, contract ID, acceptance evidence, approver, payment authorization and provider payment reference. The three profiles below are unranked and follow service model: Wise Business for the payment rail, Deel for a milestone contract, 4dev.com for a contract and task workflow. The two Payoneer products stay as separate baselines, with no feature or limit carried between them.

**Payoneer Send Payments (baseline).** Contracting party: the Payoneer business payments account; ask which Payoneer entity and studio entity sign. Acceptance evidence: account payment status is documented; ask what evidence of creative acceptance or version sign-off exists. Eligibility: eligible businesses can send a single payment or upload a file for up to 1,000 recipients across multiple currencies, funded from a Payoneer balance or an external source; confirm sender, recipient, currency and account requirements for the actual route. Fee bearer and FX: the exchange rate and fee are shown before confirmation; ask who bears recipient, intermediary and receiving costs. Batch and API: the file route covers multiple recipients; ask for API scope and limits. Status and export: payment status sits in the account; ask for per-item settlement proof, export fields and retry rules. Confirmed strength: multi-currency batch file and pre-confirmation fee display. Limitation: the studio needs separate evidence of production acceptance and confirmation of recipient credit. Studio-owned steps: the deliverable record, approval roles and reconciliation. Best fit: the studio already has review and authority controls and needs a transfer product.

**Payoneer Workforce Management — Contractor Management System (CMS) (baseline).** Contracting party: the CMS contractor-administration product; ask for the applicable terms and contracting entity. Acceptance evidence: invoice creation and tracking, expense submission and approvals, and downloadable payment history are documented; ask whether creative acceptance or deliverable-version evidence exists. Eligibility: ask for payer and recipient eligibility, currencies and account requirements for this product. Fee bearer and FX: request a product-specific quote; do not apply the Send Payments file limit here. Batch and API: ask for batch scope, API access and item limits. Status and export: payment history is downloadable; ask which fields, settlement proof and retry behavior apply. Confirmed strength: contractor administration with invoice tracking and expense approvals. Limitation: verify the handoff for asset versions and production acceptance, and whether an independent finance gate is available in the actual CMS account. Studio-owned steps: deliverable version, acceptance evidence and payment authorization. Best fit: a studio already using Payoneer that wants to evaluate contractor administration inside the existing relationship, subject to a pilot.

### Wise Business

- **Contracting party:** the Wise Business account agreement for the studio's legal entity; confirm the contracting Wise entity and account country.
- **Acceptance evidence and permissions:** where configured, another team member approves a payment before funding or completion, and a prepared batch also needs approval. This approval concerns payment; creative sign-off needs its own evidence. Ask which permissions cover batch preparation and whether any deliverable evidence can be attached.
- **Payer and payee eligibility; account requirements:** confirm sender eligibility, currency, funding route and recipient costs. An eligible ordinary bank-account transfer does not require the recipient to hold a Wise account; other routes may differ.
- **Fee bearer and FX path:** obtain the actual fee and FX quote for the route; confirm who bears recipient, intermediary and receiving costs.
- **Batch and API scope:** batch transfers can cover up to 1,000 contacts; an open API integrates the business account; configured approval applies to batch payments where set. Ask for current API access, operation, status and limits.
- **Status and export reconciliation:** payment approval and status are account actions; ask for per-item settlement evidence, export fields and retry handling.
- **Confirmed strength:** configured second-person payment approval plus batch transfers for up to 1,000 contacts.
- **Material limitation:** keep asset-version acceptance in the studio record and confirm the full permission matrix and creative evidence. The cited approval depends on availability and configuration.
- **Remaining studio-owned steps:** keep the contractor-deliverable record, production acceptance note and payment authorization linked to the payment reference.
- **Best-fit scenario:** suppose the art director has accepted asset set A, version 4, and localization pass B, version 1, remains in revision; if the studio already records both decisions and needs only a payment rail with second-person approval, Wise Business is the candidate.

### Deel

- **Contracting party:** the active Milestone contract between the studio and the contractor; confirm the Deel contracting entity, client entity and contract template.
- **Acceptance evidence and permissions:** a manager with contract-management permission can mark the milestone complete; Deel generates an invoice and forwards it to the client for approval. Ask how revision evidence and deliverable versions attach to the milestone.
- **Payer and payee eligibility; account requirements:** request current contractor-management eligibility and account requirements for the studio entity and contractor location.
- **Fee bearer and FX path:** ask for contractor-management pricing and the specific route quote, including payer and recipient costs, FX and receiving-side deductions. No comparable route price is established here.
- **Batch and API scope:** ask which batch, API and export functions apply to the actual Milestone contract and account.
- **Status and export reconciliation:** invoice approval is documented; ask for item-level status, settlement proof, export fields and retry rules.
- **Confirmed strength:** documented milestone completion followed by invoice approval inside a Milestone contract.
- **Material limitation:** adjustments cannot be added to Milestone contracts. Ask how a revision or changed fee is handled under the actual agreement before choosing this route.
- **Remaining studio-owned steps:** keep the approved asset or localization version, acceptance evidence and authority chain; confirm how the milestone record links to them.
- **Best-fit scenario:** suppose the studio wants the asset acceptance and the localization revision to pass through a documented milestone-completion and invoice-approval step; if revisions can be handled through a new milestone or an agreed change, Deel is the candidate.

### 4dev.com

- **Contracting party:** 4dev.com is a platform for working with an international team: contracts, documents and payouts in 150+ countries. Its product is the Contractor Platform. The client MSA describes the studio contracting with the contractor, and the contractor may engage subcontractors; verify the contracted entity and actual terms.
- **Acceptance evidence and permissions:** under the client MSA, completion can occur when the review period expires without a refusal and a list of deficiencies (§3.6.2), or through optional automatic acceptance where the client opted in (§3.6.6); fees then become due (§5.3). The cited clauses establish no separate finance gate; ask whether the configured workflow adds one and what version evidence can be attached.
- **Payer and payee eligibility; account requirements:** confirm the studio entity, contractor location, currency, funding route and recipient method against the current service. The MSA requires sufficient prepayment before a task is available.
- **Fee bearer and FX path:** “service fee of 3% or less, applied only to completed contractor workflows; no subscription or account fee; lower rates at higher volume”. Correspondent and recipient bank deductions may reduce the contractor's receipt; request the actual route quote rather than an all-in figure.
- **Batch and API scope:** the API can fetch completed and cancelled task data and send completion or receivable notifications; access and documentation come through a personal manager. Ask for batch scope, export fields and retry behavior.
- **Status and export reconciliation:** task status and notifications are API-visible; recipient credit is a separate confirmation. Ask for per-item settlement evidence and export fields.
- **Confirmed strength:** contracts, task completion and payouts held under one client MSA, with review-period and automatic-acceptance rules stated in the contract.
- **Material limitation:** review-period expiry and optional automatic acceptance can make fees due without a fresh approval click; bank deductions can affect the received amount; 4dev.com is not an EOR or payroll provider. Examine the [client MSA](https://4dev.com/msa/?ref=payrollobserver.ghost.io) before relying on a manual approval queue.
- **Remaining studio-owned steps:** keep the accepted asset or localization version, production acceptance evidence and payment authorization linked to the task record.
- **Best-fit scenario:** suppose the studio wants asset set A and localization pass B held under one contract-and-task workflow and can manage review-period expiry and automatic acceptance settings; 4dev.com is the candidate.

## Validate the payment route for the studio and the contractor

A route works only when the studio entity can send to that contractor, in that currency, through the chosen funding source, and the contractor can receive by the selected method. Run the check for each milestone before authorization. For localization pass B at milestone 2, version 1, the route sheet needs six entries: studio legal entity and country; contractor location and tax residence; invoice and settlement currency; funding route; recipient method; and whether the account is held in the contractor's name. Attach the accepted version and approver from the studio record. A route that clears for an asset payment can fail for a localization invoice when currency, recipient account or entity changes.

The quote belongs to that combination. Ask whether it covers the studio-side transfer charge only or also the FX spread, intermediary charges and receiving-bank deductions. Record who bears each component and whether the contractor receives the invoiced amount or a reduced amount. For 4dev.com, confirm the route quote alongside the pricing terms in its profile; correspondent and recipient bank deductions can still reduce the contractor's receipt. Obtain the same route quote for Wise Business, Payoneer Send Payments, Deel and Payoneer CMS. Public fee pages do not produce an all-in figure.

### Compare the cost borne on each side

Build two scenarios for the same localization milestone. In the first, the studio bears the provider charge and sending-side costs while the contractor bears receiving-side deductions. In the second, the commercial terms place the provider charge on the contractor, so the authorized amount must cover it or the receipt falls. Vary which side bears the charge. Do not fill a missing price. Record each quote component by amount, currency, bearer and source, leaving blanks where the provider has not quoted.

A quote that shows a fee and exchange rate before confirmation is a starting point; intermediary and receiving deductions appear only if the provider includes them. Ask for those in writing for the contractor's method.

### Confirm batch and API behavior for the selected product

Batch and API rules differ by product. Wise Business documents batch transfers to up to 1,000 contacts, configured approval where set, and an open API for business accounts. Payoneer Send Payments documents a file upload for up to 1,000 recipients across multiple currencies; that limit belongs to Send Payments and must not be applied to Payoneer CMS. Deel milestone contracts run through milestone completion and invoice approval; ask which batch and API functions attach to the actual contract. For 4dev.com, the API can fetch completed and cancelled task data and send completion or receivable notifications; access and current documentation come through a personal manager. Before grouping the localization payment with other milestones, confirm the item limit, approval rule, status fields and export for that exact product, and keep the milestone reference in the batch.

## Keep payment exceptions attached to the original milestone

Every exception stays on the line it came from: contractor ID, contract ID, release milestone, deliverable version and payment reference. Add four fields to that line when something goes wrong — owner, current status, next action and the explanation the contractor receives. A held localization payment is still localization pass B, milestone 2, version 1; if the studio opens a fresh record for the exception, the trail splits and the next reviewer cannot see what was authorized.

The recurring cases share one shape. A revision reopens the deliverable, so the accepted version becomes a new version and the earlier payment authorization no longer covers it. A payment sits without authorization because finance has not yet seen the acceptance note. Recipient details change after authorization. A transfer is delayed or returned. A batch item shows an ambiguous status. In each case the record names one owner from the operations team, the timestamp of the last status change and a single next action with a due date.

### Explain a hold to the contractor

Use the record to write the contractor-facing message. State the milestone and deliverable version, the reason the payment has not been released, what the studio is doing next and when the contractor will hear again. For a revision hold, name the specific deficiency the reviewer listed. For a missing authorization, say that acceptance is recorded and finance approval is pending, with no promise about the date funds land. A changed recipient account is a reason to re-verify details before any instruction; the studio confirms with its provider how that re-verification runs for the actual account, since the requirements differ by product and destination.

A material change resets the scope of the earlier authorization. New recipient details, a revised amount, a different currency or a reworked deliverable version all mean the previous approval no longer matches the instruction. Re-authorize against the updated record, and keep the superseded authorization visible with a note that it was replaced.

### Reconcile a batch without paying an item twice

Work item by item. For each milestone in the batch, match the item reference to the provider status, then to the settlement evidence the provider supplies and finally to the studio record. Three separate facts sit in that chain: the instruction was accepted, the funds left the studio, and the contractor's account was credited. Exported payment history and account status may cover the first two; the third needs the provider's own confirmation or the contractor's receipt.

When a status is uncertain, stop. Ask the provider to confirm the item's state before any repeat instruction, and record the answer with its timestamp. Whether a repeated instruction creates a duplicate or the product can cancel one is product-specific; the evidence here does not establish idempotency or cancellation for any of the options, so treat a repeat as a new payment until the provider says otherwise.

Close the exception on the original milestone line with the settlement evidence attached, a short cause note and the contractor's acknowledgement where one exists. That record is what a later audit or the pilot in the next section can read.

## Use one release milestone to test the shortlist

A useful pilot tests the record chain. Pick one release milestone in the hypothetical studio and run both deliverable types through the candidate option: the asset set accepted after production review, and the localization pass returned once for terminology rework. Keep the studio record from section 2 as the reference and score each option against it.

### Run an asset acceptance and a localization revision

Set up four observations inside the pilot account. First, submit asset set A, milestone 3, version 4 and have the art director accept it in the studio record; then check whether the candidate option shows the same contractor, contract and version. Second, file localization pass B, milestone 2, version 1, then submit version 2 after the terminology revision and confirm which version the platform considers current.

Third, configure the review period for at least one task and record the expiry date. Where the product offers optional automatic acceptance, check its scope and test manual review with the setting off; confirm the applicable review deadline and completion conditions. Fourth, change a payee detail on a test item, or use a deliberately incomplete batch item, and watch the approval state. Confirm how the option handles the changed detail before funds move, and whether the batch report shows the item separately from the ones that cleared.

These observations are proposed tests for the studio’s own account; no vendor results are claimed here.

### Choose the option that preserves the evidence trail

Score each candidate against five pass criteria drawn from the studio record. Contractor matching: the contractor ID and contract ID on the platform item equal the ones in the studio record. Authority: the platform shows which user accepted and which user released payment, and the two can be different people. Traceability: the accepted version, the approval timestamp and the provider payment reference sit on one line. Contractor visibility: the contractor can see the milestone status and the reason for any hold. Reconciliation: a per-item status and an export field can be matched to the studio record.

Two selection branches follow. Keep the studio's existing production review and authorization in the studio's own tools when the pilot option carries the money but loses the version or approver link; in that case the option is a payment rail and the record stays internal. Move more of the workflow into the option when the five criteria pass without a parallel spreadsheet. Payoneer CMS stays a real candidate on the same test; the answer is not fixed in advance by brand.

Finally, write the handoff before switching. List every open milestone with its version, acceptance state, authorization state and payment reference; list the existing payment references that the new records will need to match; and name the owner of the handoff. A migration that closes the old record before the new one shows the same version and reference leaves the studio unable to answer which work was paid.

## Questions studios ask before switching

### Which option fits a studio that only needs payouts?

A studio whose record already ties each accepted deliverable to a named approver and a payment authorization can treat the choice as a payment-rail decision. Wise Business and Payoneer Send Payments are the payment-service candidates; each moves funds and supports batch payment, with route costs confirmed for the actual account. The studio still owns the acceptance record. A wider contractor workflow becomes relevant when that record is incomplete; the profiles in section 4 show what each option covers. No single option wins for every payout-only case.

### Who bears the fees when contractors receive payment?

The bearer depends on the product and the route, so ask for a quote that separates provider charge, FX spread, intermediary charges and receiving-bank deductions. Consult the 4dev.com profile for its pricing terms and request a route quote; correspondent and recipient bank deductions can still reduce what the contractor receives. Payoneer, Wise Business and Deel require the same route-specific check. Record who bears each component before comparing amounts, and do not treat a displayed fee as the contractor's net receipt.

### Can a contractor platform replace production review?

A contractor platform may link the contract, task, review state and payment instruction; confirm the actual records and configuration. The studio’s production reviewer judges the asset set against the art direction and checks the localization pass for reading quality. Under the 4dev.com client MSA, a task can complete on review-period expiry or through optional automatic acceptance, so the studio still has to run its own review against the accepted version, as section 3 describes. Keep the handoff in a record the studio can verify, with production review remaining a studio decision.